The Project
Known for its quality, innovation and industry leading service and support, APC has received multiple awards and
public recognition for its achievements.
It’s not a surprise then, that APC would
turn to Innovative Technology Group (ITG)
to design and install their facility audiovisual
solutions when they built the new Schneider
Electric Technology Center in St. Louis.
Midway through the project, Schneider Electric bought APC. With a change in
scope and key contacts, ITG had to refocus direction to keep the project on track,
while still meeting the new owners’
expectations and budget restraints. Tasks
such as construction drawings and project timelines had to be revised and coincide
with a new scope and construction timeline. “We updated construction drawings
and proposals a number of times, but these
changes were not as much a concern to us
as maintaining the cost versus performance
issue for APC,” explains George Brosie,
Director of Engineering for ITG. “With this
change in scope, we also had to give them a
foundation of what they would need for
APC’s long-term technology strategy. As a
result, we have a conduit infrastructure in
place and pipes installed for future expansion
to reduce the amount of money and
time it would take for reconstruction in the
future.” The Result
As a supplier of audio visual power equipment and racks, APC product was incorporated into every aspect of the technology
designed by ITG. Power, racks, and sources were all integrated
with the AV equipment to create a facility-wide design met to
the expectations and standards of the client. As a result, APC
has a state-of-the-art facility that improves the e ectiveness
and productivity of their employees. ITG’s goal was to assist
APC in facilitating their own mission of providing “rapid delivery
of innovative solutions to real customer problems.” Sounds
like they’re right on track. >>>read more |
|
|