The Project
Peabody Energy wanted to build a new
corporate boardroom that would be used
for board meetings and strategic, energy
planning sessions with 9th floor Executives.
The Boardroom, however, was going to be
a brand new build-out. When Innovative
Technology Group (ITG) was brought in to
assess the room, there was one big hurdle
that had to be overcome: a Draper 12’ rear
projection screen was recommended for the
size of the room, but it could not be brought
in via an elevator. The window in theboardroom
would have to be removed and the
screen would have to be lifted into the room
- located on the 9th floor of Peabody Headquarters
in downtown St. Louis.
The Result
On a quiet, early Saturday morning, a huge
crane started its engine in downtown St.
Louis, to the east side of Peabody’s headquarters.
A 12’ rear projection Draper screen,
boxed up and hanging from aircraft cables,
was elevated to a window on the 9th floor
and was guided safely into the building.
With equipment now all in the new boardroom,
installation and callibration could
begin. Once the rear projection screen was
placed at the front of the boardroom, retracting,
cherry wood panels were installed. >>>read more
|
|
|